Windows and doors (mostly) in!

We are both in ABQ now and loving being here and reunited! Although I have been on "vacation" this week, we've been working hard ordering IKEA cabinets, appliances, tv (first new TV in 27 years!!!) and (I can hardly stand it!!) an outdoor kitchen and grill! :) The house has most of the windows and doors installed (see above) and inside most of the electrical work has been done. Our electrician (Julio Chacon) said that he very much liked the house's design as well as the lighting design (kudos go to our awesome architect, Leslie Buerk!)

The graywater system has been worked out with the plumber and the City (again, thanks to Leslie). Two out of three of our showers will be tied in to the graywater system as well as the washing machine. This means that much of our water will be used twice and then recharging the aquifer. Karin Lynn decided we needed a "dog wash station" outside for dirty dog feet (a very common occurance in NM). We figured out a low-tech solution that will be installed outside the back of the garage. I'm sure our future dogs will be so very happy to have clean paws! :)

Today is the wine festival in Bernalillo, NM. About 20-30 NM vintners come and show their stuff...along with other artisans, food crafters, etc. Should be fun! 







1 comment:

  1. This is going to be an incredible home. I am really excited about coming to see it.

    ReplyDelete